Welcome to the Schneider Electric corporate Website

ENGLISH | FRENCH

You can choose another country to view available products or go to our Global website for company information.

Choose your country or region

     

    Acti 9 Smartlink SI D

    Monitor your large business electrical equipment via your supervision system

    Acti 9 Smartlink SI D is the simplest way to connect your electrical equipment to your supervision system & improve your electrical uptime with pre-alarms. Grow anytime your energy monitoring of final loads with PowerTags. For the first time it also fits in existing panels. Clarify the limits of responsibilities between the panel builder and the BMS contractor.

    Acti 9 Smartlink SI D
    • Features

      • Acti 9 Smartlink SI D is fast to install
        It reduces wiring errors of meter installation thanks to PowerTag wireless energy sensors.
      • Acti 9 Smartlink SI D is connected
        Acti 9 Smartlink is able to send pre-alarms and alarms over e-mail or directly to EcoStruxure™ Facility Expert app’. You can customize your alarms either in your BMS, or directly from your Smartlink SI D.  Any trip, overload pre-alarm , or voltage loss alarm, can be easily configured on the Acti 9 Smartlink embedded web pages.
      • Acti 9 Smartlink SI D is flexible
        > Grow your load monitoring system at your own pace

        Acti 9 Smartlink also evolves to provide you with even more flexibility. The changes can now be done easily during the project implementation, or even later.
        Upgrading the installation with more monitoring is getting so easy, thanks to the PowerTag Energy Sensors. You can add later more metering, to each final load, in case of a change of government energy regulation, and still keep your system fully compliant. The system collects the rich and accurate Data from the Powertag wireless energy sensors, as well as Modbus meters of all kind, and hence accurately monitor all the critical loads that are key to run customers’  business . And this is affordable, without compromising data quality and quantity collected.
      • Acti 9 Smartlink SI D is simple to commission into a BMS
        It defines clear limits of responsibilities between project actors. The Panel builder can easily test all the connections of the system, and then generate a complete test report, with all the necessary data, that clearly shows the panels are fully ready for integration into Building Management Systems.
        This test report is available in Smart Test commissioning software.
      • Acti 9 Smartlink SI D is part of Acti 9 Communication System
        Acti 9 SmartlinK SI D can be combined with Acti 9 Smartlink SI B for switchboards that requires monitoring and control.
        For large installations, we can combine Acti 9 Smartlink SI B, with a few Modbus slaves, called Acti 9 Smartlink Modbus, to have as many inputs as required. It is natively integrated to ComX510 to get Energy Dashboards at building level, SpaceLynk for simple scheduling, or SBO automation Server for a Schneider-Electric Building System.

       

       



      Benefits

      Acti 9 SmartlinK SI D is simple to install, commission in new or existing buildings.
      It is easily connected to your BMS, your mailbox, or your EcoStruxure™ smartphone app.
      It is open, flexible and scalable to grow your monitoring at your own pace.

      Applications

      Monitor of your electrical equipments that are key to your business.
      Improve Energy efficiency
      Cost allocation and remote-metering.