Global (English)
Welcome to the Schneider Electric corporate Website

ENGLISH | FRENCH

You can choose another country to view available products or go to our Global website for company information.

Select your location

Building Advisor Case Study Rooftop Units

  • Reference

    PP-BO-ROOFTOP-A4

  • Type

    Customer success story

  • Languages

    English

  • Date

    01/06/2013

  • Version

    1.0

Download
  • Reference

    PP-BO-ROOFTOP-A4

  • Type

    Customer success story

  • Languages

    English

  • Date

    01/06/2013

  • Version

    1.0

Description:

Building Advisor diagnostics and reporting were deployed to provide ongoing commissioning on newly installed rooftop units at a one-story community center housing offices, a gymnasium, and community rooms. Five RTUs were connected to the cloud-based system for monitoring and diagnostics. Almost immediately, several problems with RTU scheduling, compressor cycling, and simultaneous heating and cooling demands were found leading to controls adjustments to reduce energy consumption and costs. Only 10 HVAC sensors and settings on each RTU (a total of 50 points) were set up for monitoring: compressor status, cooling demand, gas valve status, heating command, outside air temperature, power status, return air temperature, suction line temperature, supply air temperature, and fan status. Despite the low level of instrumentation, several key issues were diagnosed.

Files for Download

Add to my Documents

Description:

Building Advisor diagnostics and reporting were deployed to provide ongoing commissioning on newly installed rooftop units at a one-story community center housing offices, a gymnasium, and community rooms. Five RTUs were connected to the cloud-based system for monitoring and diagnostics. Almost immediately, several problems with RTU scheduling, compressor cycling, and simultaneous heating and cooling demands were found leading to controls adjustments to reduce energy consumption and costs. Only 10 HVAC sensors and settings on each RTU (a total of 50 points) were set up for monitoring: compressor status, cooling demand, gas valve status, heating command, outside air temperature, power status, return air temperature, suction line temperature, supply air temperature, and fan status. Despite the low level of instrumentation, several key issues were diagnosed.

Files for Download