Determining the Power, Cooling, and Space Capacities when Consolidating Data Centers

When planning the consolidation of multiple data centers into existing data center(s), it is often difficult to establish the various capacities and capabilities of each site’s physical infrastructure. This information is a key input to deciding which sit

Date: 17 July 2012 | Type: White paper
Languages: English | Version: V2
Document Reference: SPD_WTOL-8MAHR4_EN

Files

File Name
WTOL-8MAHR4_R2_EN.pdf

Determining the Power, Cooling, and Space Capacities when Consolidating Data Centers

When planning the consolidation of multiple data centers into existing data center(s), it is often difficult to establish the various capacities and c