Global (English)
Welcome to the Schneider Electric corporate Website

ENGLISH | FRENCH

You can choose another country to view available products or go to our Global website for company information.

Select your location

Guide to using the IEC 61557-12 standard to simplify the setup of an energy measurement plan

  • Reference

    998-19721655_GMA-US

  • Type

    White paper

  • Languages

    English

  • Date

    27/05/2016

  • Version

    1.1

Download
  • Reference

    998-19721655_GMA-US

  • Type

    White paper

  • Languages

    English

  • Date

    27/05/2016

  • Version

    1.1

Description:

Many facility owners and managers are setting up measurement plans to gather the broad range of information needed to improve energy efficiency, reduce operating costs, and ensure power reliability. To collect this information requires power metering and monitoring devices (PMDs) that go beyond the capability of the traditional revenue meter. Up to now, choosing the best PMD for each application has been difficult due to the lack of common references between vendors regarding accuracy, operating conditions, and quality. This guide will help electrical system designers use the IEC 61557-12 standard to more easily specify the appropriate devices needed to support an effective power and energy management plan.

Product Ranges:

MasterPact NW, PowerTag, PowerLogic ION7550 | ION7650, Acti 9 iEM3000, PowerLogic ION8650, ...View more MasterPact NW, PowerTag, PowerLogic ION7550 | ION7650, Acti 9 iEM3000, PowerLogic ION8650, MasterPact NT, MasterPact MTZ, PowerLogic PM3000 series, PowerLogic PM8000 series, PowerLogic PM5000 series ...View less

Files for Download

Add to my Documents

Description:

Many facility owners and managers are setting up measurement plans to gather the broad range of information needed to improve energy efficiency, reduce operating costs, and ensure power reliability. To collect this information requires power metering and monitoring devices (PMDs) that go beyond the capability of the traditional revenue meter. Up to now, choosing the best PMD for each application has been difficult due to the lack of common references between vendors regarding accuracy, operating conditions, and quality. This guide will help electrical system designers use the IEC 61557-12 standard to more easily specify the appropriate devices needed to support an effective power and energy management plan.

Product Ranges:

MasterPact NW, PowerTag, PowerLogic ION7550 | ION7650, Acti 9 iEM3000, PowerLogic ION8650, MasterPact NT, MasterPact MTZ, PowerLogic PM3000 series, PowerLogic PM8000 series, PowerLogic PM5000 series

Files for Download

My List

Store, email, and share your favorite documents.

View My Documents