You are here:Home
> Solutions
> Optimise design and operation costs with integrated solution for medium size wastewater treatment plants
Optimise design and operation costs with integrated solution for medium size wastewater treatment plants
Challenges
Manage evolutions and extensions while optimizing investment and operation cost with a minimal carbon footprint
Solutions
Schneider Electric provides a very flexible solution ensuring installation simplicity and extensibility at optimum cost
Value Proposition
Up to 50% reduced time for renovation and design phase Tested and validated architecture, advanced development tools, specialised teams
Up to 15% energy consumption and carbon footprint reduction Combined energy efficiency and process efficiency services
Improved water quality and availability Innovative power and process control solutions
Plant and remote sites active security Integration of process control and security management
Differentiation Factors
Full coverage of all infrastructure from the smallest pumping station to the largest and most complex treatment plant with a single project and services entry point
Integrated Ecostruxure solution for electrical distribution, motor control, process optimisation and security from enterprise management information system to field devices
Innovative technologies for energy and carbon footprint reduction