- Enhance installation reliability and optimise power production
- Reliability
multiplied by 2 thanks to type tested architecture
- Power production
increased by 30%- Energy efficiency
doubled- Reduce Operation and capital costs
- Investment
cost reduced by 20%- Non-productive
time divided by 2 optimising power output
- Maintenance
cost 30% lower