You are here:Home
> Solutions
> Optimize Cost with Integrated Data Center Facility Module Architecture
Optimize Cost with Integrated Data Center Facility Module Architecture
Challenges
Customers need to deploy large data centers quickly and at a much lower cost that are predictable, flexible and much less complex.
Solutions
Modules in 500kW (400kW Chilled Air) that are fully integrated for quick and easy deployment to power can cool a data center or add power and cooing capacity or redundancy.
Value Proposition
Save 10-20% on CapEx Manufacturing efficiencies, Integration of controls efficiencies, Rightsizing, Lower cost core and shell
Save 20-35% on OpEx Economizers, Integrated and tuned cooling controls, Avoid overbuilt capacity, Higher equipment efficiencies
Deliver up to 99.999% Reliability Easier to deploy redundancy needed in power or cooling
Up to 60% Faster from Design to Deploy Manufactured in a factory while sitework iis being done for quick and easy drop-in and turn-on
Differentiation Factors
1 unique Schneider Electic point of contact for the whole project
1 unique data center supervision open to 3rd party systems, integrated - HVAC control, Security Management, IT Room Management, Power Management
1 unique supervision system at your different data centers facilitate your corporate energy efficiency programs
Architecture
View Larger Image
Products & Systems
Global Supervision
Power SCADA~ION Entreprise~ION EEM~Energy Efficiency Manager~TAC Vista BMS~Continuum BMS