Solaire Direct - Vinon sur Verdon

(France)


Customer Profile
Solairedirect, already present within the residential photovoltaic market, has now decided to invest in solar array projects with production capacities of several megawatts.
Located in Vinon sur Verdon in the Var département, France, this initial 4.2 MW array consists of 19,000 220 peak-watt panels installed over 9 hectares.


Customer objectives
The Vinon array will produce enough electricity to supply 2,000 homes, i.e. nearly 4,600 inhabitants. An array of this type can save 2,900 tons of CO2 from being produced per year.
 In order to ensure quick turnaround on its investment, Solairedirect  aims to install this array as quickly as possible together with reliable, competitive players, while offering them attractive technical solutions and proposing an operating and maintenance contract that is compatible with their business plan.


Customer benefits
- A single contact for the turnkey electrical operations
- Minimum downtime in the event of a fault, owing to the monitoring system that allows production to be controlled remotely
- A return on the investment owing to the competitiveness of the Schneider Electric offer
- Production secured over the next 20 years with the guarantee, and the operating and maintenance contract established with Schneider Electric.


Implementation Methodology
- Turnkey contract for the complete electrical system and the power grid connection
- Security system
- 20-year operating and maintenance contract


How did we estimate the energy savings
The Vinon solar array was designed to achieve the highest level of performance from the installation, producing the greatest amount of electricity possible (in terms of KWh).
Special care was given to the DC wiring, the inverters selected provide the greatest efficiency on the market, and the transformers are low-loss type.
Finally, the monitoring and control system is capable of detecting even minor incidents.


Solution overview

View Larger Image

A turnkey contract for the supply of a complete system involving the conversion and distribution of photovoltaic electricity, including:
 - Studies, supply and installation of the electrical system between the solar modules and the EDF power grid including Xantrex inverters
- Overall project control and coordination of partners and sub-contractors
- On-site commissioning
- Securing of the site
- 20-year operating and maintenance contract. The contract includes preventive and corrective maintenance operations with a commitment to operational availability of the solar array equipment.
Products & Systems
SUPERVISION_ICON Image
Global Supervision
  • Kerwin SCADA~Pelco video solutions
To know more
Contact an Expert
Contact an Expert
See other references
Solution overview
Solution Overview image for reference Solaire Direct - Vinon sur Verdon