Global|Home|Site map|Contact |Français
 Search form button
 
 
 

Press kit

 
 

2004 June / July : EURO 2004

For the brand new Estádio de Luz stadium, which has hosted the final of the Euro 2004 Soccer Cup on July 5, Schneider Electric has supplied a comprehensive solution spanning MV/LV power distribution and a centralized facilities management system. The solution delivers high availability of the electrical network, guaranteeing that organizers, players and spectators will all enjoy optimum safety and comfort throughout this premier event in the world of soccer.

In brief :

Additionnal information :

Photo library

Annexes

Euro 2004 - 08/06/2003

Benfica stadium: "Estadio de Luz"

High definition:  

eps file (1471 ko)

> Download

Low definition:  

jpeg file (540 ko)

> Download

Euro 2004  - 08/06/2003

Merlin Gerin MV SM6 Merlin Gerin cubicles equipped with Sepam protection and control relays

High definition:  

eps file (670 ko)

> Download

Low definition:  

jpeg file (308 ko)

> Download

Euro 2004  - 08/06/2003

Merlin Gerin Prisma P BMS equipped with Masterpact and Compact NS circuit breakers and PowerLogic monitors

High definition:  

eps file (862 ko)

> Download

Low definition:  

jpeg file (341 ko)

> Download

Euro 2004 - 08/06/2003

One of the Telemecanique Premium PLCs integrated in the centralized facilities management system

High definition:  

eps file (767 ko)

> Download

Low definition:  

jpeg file (369 ko)

> Download

Euro 2004  - 08/06/2003

Benfica stadium central control center with one Monitor Pro monitoring substation dedicated to the centralized facilities management

High definition:  

eps file (521 ko)

> Download

Low definition:  

jpeg file (274 ko)

> Download

Euro 2004 - 08/06/2003

Monitoring screen

High definition:  

eps file (704 ko)

> Download

Low definition:  

jpeg file (209 ko)

> Download

  
 
To know more 

Presence in the world

Media library

Subscription - Be kept informed of the issue of: