Technical FAQs

Ask a Question

How can I configure the "Simple Solution for Connecting an Engineering Tool to a Hot Standby Topology" described in the M580 Hot standby Planning Guide

The Hot standby Planning Guide shows a simple topology that may be used to connect Engineering tools on both HSBY CPU, using a Layer 2 switch.
The attached file describes the steps to take to configure the engineering PC and the ConneXium Managed  switch, TCSESM163F2CU0.
Was this helpful?
What can we do to improve the information ?