Malaysia Prime Minister’s Office says “yes” to energy savings in its buildings

  • Reference

    998-1284-01-21-14AR0_EN

  • Type

    Customer success story

  • Languages

    English

  • Date

    21/01/2014

  • Version

    1.0

Download
  • Reference

    998-1284-01-21-14AR0_EN

  • Type

    Customer success story

  • Languages

    English

  • Date

    21/01/2014

  • Version

    1.0

Description:

KFM, a green buildings solution provider with offices in Kuala Lumpur, Abu Dhabi, and Dubai, took on the Malaysian Prime Minister’s Office green building project. KFM needed a building management system (BMS) that could improve energy efficiency, indoor environmental quality, sustainable site planning, and water efficiency, among other criteria. KFM says that with the Schneider Electric BMS, “we give customers the confidence to make fact-based decisions for improving energy use, operational efficiency, comfort, and financial performance throughout their building’s life cycle.”

Files for Download

Add to my Documents

Description:

KFM, a green buildings solution provider with offices in Kuala Lumpur, Abu Dhabi, and Dubai, took on the Malaysian Prime Minister’s Office green building project. KFM needed a building management system (BMS) that could improve energy efficiency, indoor environmental quality, sustainable site planning, and water efficiency, among other criteria. KFM says that with the Schneider Electric BMS, “we give customers the confidence to make fact-based decisions for improving energy use, operational efficiency, comfort, and financial performance throughout their building’s life cycle.”

Files for Download

My List

Store, email, and share your favorite documents.

View My Documents View My List